Skip to content

Merge dependabot/maven/deploy/dev/deploy-dependencies-5269af9a95 into…

e6f2e3f
Select commit
Loading
Failed to load commit list.
Merged

[dependency]: Combine dependabot PRs #748

Merge dependabot/maven/deploy/dev/deploy-dependencies-5269af9a95 into…
e6f2e3f
Select commit
Loading
Failed to load commit list.
Jenkins @ NEMProject / Jenkins CI - Controller succeeded Nov 24, 2025 in 20m 2s

Success

Details

  • Declarative: Checkout SCM (4.4 sec)
    • display environment (1.5 sec)
    • checkout (1.4 sec)
    • create pipeline jobs (6.4 sec)
      • read build configuration (1.2 sec)
      • Multibranch job (1.2 sec)
      • Pipeline job (1.2 sec)
    • build jobs (19 min)
      • NEM Core (6 ms)
        • NEM Core (16 min)
      • NEM Deploy (6 ms)
        • NEM Deploy (8 min 57 sec)
      • NEM Infrastructure Server (6 ms)
        • NEM Infrastructure Server (19 min)
      • NEM Peer (3 min 38 sec)
        • NEM Peer (3 min 33 sec)