Lead Engineer: Rich
Deployment Platform: Jeep Tailgate / Radio Shack
Hardware Requirements: FT-710 (or equivalent tube amp for desiccant), Kraft Singles, Bologna.
This repository contains the Official Standard Operating Procedure (SOP) for high-utility, low-thermal-requirement snacking. Developed and field-tested in the high-humidity environment of Pascagoula, Mississippi.
- Redneck_Guide.md: The raw technical source code.
- Redneck_Guide_Finished.pdf: The compiled, classified field manual.