Skip to content

Merge pull request #44 from ShipEngine/fix-manifest-version #64

Merge pull request #44 from ShipEngine/fix-manifest-version

Merge pull request #44 from ShipEngine/fix-manifest-version #64

Triggered via push December 16, 2025 19:00
Status Failure
Total duration 1m 8s
Artifacts

CI.yml

on: push
coveralls
55s
coveralls
Matrix: lint_and_pytest
coveralls_finish
6s
coveralls_finish
Fit to window
Zoom out
Zoom in

Annotations

5 errors
lint_and_pytest (3.10)
Process completed with exit code 1.
lint_and_pytest (3.11)
The strategy configuration was canceled because "lint_and_pytest._3_10" failed
lint_and_pytest (3.11)
The operation was canceled.
lint_and_pytest (3.12)
The strategy configuration was canceled because "lint_and_pytest._3_10" failed
lint_and_pytest (3.12)
The operation was canceled.