Skip to content

Merge pull request #42 from ShipEngine/fix-release-please-config #62

Merge pull request #42 from ShipEngine/fix-release-please-config

Merge pull request #42 from ShipEngine/fix-release-please-config #62

Triggered via push December 16, 2025 18:56
Status Failure
Total duration 1m 5s
Artifacts

CI.yml

on: push
coveralls
55s
coveralls
Matrix: lint_and_pytest
coveralls_finish
4s
coveralls_finish
Fit to window
Zoom out
Zoom in

Annotations

5 errors
lint_and_pytest (3.10)
Process completed with exit code 1.
lint_and_pytest (3.11)
The strategy configuration was canceled because "lint_and_pytest._3_10" failed
lint_and_pytest (3.11)
The operation was canceled.
lint_and_pytest (3.12)
The strategy configuration was canceled because "lint_and_pytest._3_10" failed
lint_and_pytest (3.12)
The operation was canceled.