Update CI/CD workflows to use current actions and Python versions #49
CI.yml
on: pull_request
coveralls
59s
Matrix: lint_and_pytest
coveralls_finish
0s
Annotations
8 errors
|
lint_and_pytest (3.10)
Process completed with exit code 1.
|
|
lint_and_pytest (3.13)
The strategy configuration was canceled because "lint_and_pytest._3_10" failed
|
|
lint_and_pytest (3.13)
The operation was canceled.
|
|
lint_and_pytest (3.12)
The strategy configuration was canceled because "lint_and_pytest._3_10" failed
|
|
lint_and_pytest (3.12)
The operation was canceled.
|
|
lint_and_pytest (3.11)
The strategy configuration was canceled because "lint_and_pytest._3_10" failed
|
|
lint_and_pytest (3.11)
The operation was canceled.
|
|
coveralls
Process completed with exit code 1.
|