Smoke test #128
build.yml
on: push
build-and-unit-tests
2m 33s
Matrix: instrumentation-tests
Annotations
5 errors
|
instrumentation-tests (33, google_apis)
The process '/usr/bin/sh' failed with exit code 1
|
|
instrumentation-tests (29, google_apis)
The operation was canceled.
|
|
instrumentation-tests (29, google_apis)
The strategy configuration was canceled because "instrumentation-tests._33_google_apis" failed
|
|
instrumentation-tests (36, google_apis)
The operation was canceled.
|
|
instrumentation-tests (36, google_apis)
The strategy configuration was canceled because "instrumentation-tests._33_google_apis" failed
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
android-test-report
Expired
|
6.04 KB |
sha256:b6d0631edf262c075b34ab87b626fd1f7f2c42aa9e8ba34e1b3f11917567d3fb
|
|