Skip to content

IDEV-2063: Adjust failing test. #38

IDEV-2063: Adjust failing test.

IDEV-2063: Adjust failing test. #38

Triggered via push April 28, 2025 18:05
Status Failure
Total duration 1m 13s
Artifacts
Matrix: test
release-build
0s
release-build
publish-to-pypi
publish-to-pypi
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (3.9)
Process completed with exit code 1.
test (3.11)
Process completed with exit code 1.
test (3.11)
The strategy configuration was canceled because "test._3_9" failed
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_9" failed